top of page

CODE COMPLAINCE 

NYC DEPARTMENT OF BUILDINGS CODES

Are your elevators compliant with the current and upcoming NYC Department of Building codes?

2027 Single Plunger Brake:

Code 3.8.4.1 states that by January 1, 2027  all elevators with a single plunger brake will need to be replaced or modified with a secondary brake mechanism (rope gripper).

Forefinger pressing the fifth floor butt

2020 Door Lock Monitoring: :

Code 3.10.12  states that as of  January 1, 2020 all automatic passenger and freight elevators needs a door lock monitoring system to monitor and prevent automatic operation of passenger and freight elevators with faulty door contact circuits.

CODE COMPLIANCE RESOURCES   

Main Office and Mailing Address

215 Airport Executive Park 

Nanuet, NY 10954

​

 NYC Office

42 Broadway, 12th Floor 

New York, NY 10004

Telephone

(845) 708-5560 

(718) 515-5438

Fax

(845) 262-1627

Office Hours

Monday-Friday: 8am-4pm

Saturday-Sunday: Closed 

​

Copyright © 2021 Lift Tech LTD. All Rights Reserved 

bottom of page